Texas

Resilience System


You are here

US grid interconnection backlog jumps 40% with wait times expected to grow...

Primary tabs

The total capacity of energy projects in U.S. interconnection queues grew 40% year-over-year in 2022, with more than 1,350 GW of generation and 680 GW of storage waiting for approval to connect, according to a new report from the Lawrence Berkeley National Laboratory.

...

Country / Region Tags: 
Problem, Solution, SitRep, or ?: 
Groups this Group Post belongs to: 
- Private group -
howdy folks
Page loaded in 0.443 seconds.